M2 - Problem Solving

Criteria - propose answers to two queries related to interpretation of the Building Regulations

 

 

Task

Your MD has asked you to liaise between the designer and the site foreman to help resolve the following problems:

  1. The site foreman wants to change the design of the external windows, you should provide him and the designer with information relating to the amount of natural light required.
  2. After a site visit the designer is concerned about the pitch of a disabled ramp leading up to the main entrance, you should provide details and diagrams for the site foreman to be able to check the pitch and width of the ramp. You will also need to check the hand rails are up to spec.